References - Capital Projects
|
Customer |
Name of the project | Time of immplementation |
|
ABB s.r.o. |
Replacement of electrical protectors on Unit 3 of Počerady Power Station |
2005 |
|
Refurbishment of Final Condensate Treatment Substation, Počerady Power Station |
2005 | |
|
AQUA - STYL spol. s r.o. |
Refurbishment of Plav Water Treatment Plant pump station – Phase II |
2004 |
| Clyde Bergemann GmbH | Replacement of water sprays, Prunéřov II Power Plant | 2004 |
|
ČESKÝ TELECOM, a.s. |
Opening sealings in fire-resistant walls (for cabling) |
2002-2005 |
|
ČEZ, a.s. (SČE a.s.) |
Power line 110 kV Trmice – branch line Úžin 2nd stage, processing of design documentation |
2008 |
|
Trmice-Koštov, renewal of the line from 35 kV to 110 kV, processing of design documentation |
2008 | |
|
Lovosice substation110/22 kV – very high voltage, high voltage and the building part, processing of design documentation |
2008 | |
|
Podhájí Vilémov (TR Vilémov), line 35 kV, processing of design documentation |
2008 | |
|
ČEZ, a.s., Vodní elektrárny |
TG4 overhaul, replacement of activation system, Dalešice Power Plant |
2003-2004 |
|
Refurbishment of LV wiring, lighting and station transformer, Orlík Power Plant |
2001-2002 | |
|
ČEZ, a.s. |
Measure hydrogen concentrations in TS 10,50 system at Dukovany NPP |
2005 |
|
Overhaul of 22 kV substation, Slapy Power Plant |
2004-2005 | |
|
Refurbishment of office building infrastructure, Temelín NPP |
2005 | |
|
Refurbishment of 6 kV substation at Poříčí Power Stations |
2004-2005 | |
|
Replacement of low-oil MV switchgears at Tisová Power Plant |
2005 | |
|
Evaporator pipe temperature measurement, Dětmarovice Power Plant |
2004-2005 | |
|
Electricity supply to foreswitching base buildings, Temelín NPP |
2005-2006 | |
|
Expansion of diagnostic systems, Dukovany NPP |
2005-2006 | |
|
Expansion of 110 kV substation |
2006-2008 | |
|
Mixing equipment in wastewater tank – Tušimice Power Plant |
2004 | |
|
Addition of connection valves at connection points, Temelín NPP |
2005 | |
|
Overhaul of TG1 panels, Tisová Power Station |
2004 | |
|
Expansion of diagnostic systems |
2005-2006 | |
|
Overhaul of chemical water treatment facility I&C system – Tisová Power Plant |
2004 | |
|
TG4 activation system, Dalešice |
2004 | |
|
Repair of fire-resistant dividing walls at R 15 KV substation, Lipno Power Plant |
2004 | |
|
As-if cabling study, Dukovany NPP |
2004-2009 | |
|
Modify connection of backup power supply to 110 kV substation at Dukovany NPP |
2003-2004 | |
|
Design of a DAS system for Unit 3 of Dukovany NPP |
2004-2005 | |
|
Overhaul of gas boiler island control system, Temelín NPP |
2003-2004 | |
|
Refurbishment of 110 kV substation, Hněvkovice pump station |
2006-2007 | |
|
Electrical fly-ash separator – replacement of active portion and refurbishment of electrical portion, Prunéřov Power Plant |
2005 | |
|
Replacement of DG and spark protectors, Temelín NPP |
2003-2005 | |
|
Refurbishment of pump station, Jihlava |
2001 | |
|
Transformer tap switches upgrade, Temelín NPP |
2004 | |
|
Refurbishment of wiring sub-panels, Dukovany NPP |
2004-2007 | |
|
Modifications to fire extinguishing system on coal conveying equipment at Tisová Power Plant |
2005 | |
|
Šimonovice- Bezděčín – line 110 kV, processing of project documents |
2008 | |
|
ČEZ, Distribuce a.s., |
Refurbishment of 110 kV substation in Horní Bříza |
2005 |
|
Refurbishment of R 167 A, 22 kV substation in ŠKODA compound, Plzeň |
2004-2005 | |
|
ČEZ, Distribuce a.s. |
Příbor – adjustment and completion of the R 110 kV substation for Mošnov, processing of realization design documents |
2007 |
|
Industrial zone Hrabová – distributing substation 22 kV, processing of realization design documents |
2006 | |
|
Dřevostroj Čkyně |
Electrical wiring, Ptení Sawmill |
2005 |
|
Emerson Process Management |
Supply of cabinets for Ovation control system – Eregli (Turkey) |
2005 |
|
Refurbishment of I&C System at Elektrenai Power Station (Lithuania) – Units 5,7,8 |
2005-2008 | |
|
Supply of power supply cabinets for Ghalilah Power Plant (UAE) |
2004 | |
|
Supply of Ovation cabinets for Bucharest South&West (Romania) |
2004 | |
|
Emerson Process Management Power and Water Solutions |
Burner monitoring system, Elektrenai Power Plant (Lithuania) |
2006-2008 |
|
Emerson Process Management Servicios, S.L. |
Supply of cabinets for Ovation control system, As Pontes Power Plant (Spain) |
2004, 2006 |
|
Emerson Process Management, |
Installation of stations on Unit B24 at Prunéřov II Power Station | 2004 |
|
Supply of cabinets for Ovation control system – Al-Jubail (Saudi Arabia) |
2005 | |
|
Technical assistance – Ataka Power Plant (Egypt) |
2004-2005 | |
|
Project design and management of installation and start-up activities, Layyah Power Plant (United Arab Emirates) |
2006-2007 | |
|
ENERGOAQUA, a.s. |
Supply of MV substation and transformer equipment |
2006 |
|
HOCHTIEF CZ a.s. |
EFPS, LV wiring, information network for spent fuel storage facility, Dukovany NPPSupply of MV substation and transformer equipment |
2005-2006 |
| CHEMCOMEX Praha, a.s. | On-board fire extinguishing facility for main cooling pumps | 2004 |
|
Invelt - elektro s.r.o. |
Replacement of 220 MW TG activation systems, Dukovany NPP |
2005-2007 |
|
Jihočeský vodárenský svaz |
Refurbishment of MV wiring in pump station, Plav Water Treatment Plant |
2001 |
|
ŠKODA JS a.s. |
Dukovany NPP I&C System Renewal |
2001-2009 |
|
Dukovany NPP I&C System Renewal M3–M5 |
2008-2015 | |
|
ŠKODA PRAHA a.s. |
Replacement of electrical equipment and DGS I&C system, Dukovany NPP |
2004 |
|
Refurbishment of HVAC system, Dukovany NPP |
2003 | |
|
Upgrade of substation cooling system on TG 220 MW activation, Dukovany NPP |
2003 | |
|
Temelín NPP Data Center |
2005 | |
|
Heating the underside of pipe corridors in Temelín NPP |
2003 | |
|
KRÁLOVOPOLSKÁ RIA, a.s. |
Refurbishment of wastewater treatment plant, Jihlava |
2003 |
|
Ministerstvo vnitra ČR |
Pokládka a oživení strukturované kabeláže |
2007 |
|
MOTOCO a.s. |
Supply of power to new technology in MOTOCO plant |
2001 |
|
Electrical wiring of instrumentation and control center |
2004 | |
|
MOTOR JIKOV Tlaková slévárna |
Reconstruction of electrical wiring in shipping hall and substation |
2004 |
|
MSEM, a.s. |
110 kV Nošovice substation - Delivery of current to the industrial zone, processing of the building permission documentation and realization design documents |
2006 |
|
NG NAEK Energoatom |
Supply of components for repair of hermetically sealed cable housings for an NPP in Ukraine |
2005 |
|
Paksi Atomerömü |
Supply of equipment for measuring boric acid concentrations for use in Paksi Power Plant (Hungary) |
2006 |
|
Ústav jaderného výzkumu Řež |
Overhaul of R422 MV substation |
2002 |
| Project design and technological portion for PET CENTRUM BRNO, diagnostics add-on at MOI, Radiopharmaceuticals and Nuclear Medicine building |
2006-2007 | |
|
Va Tech Wabag GmbH Leipzig |
Refurbishment of automation at Mariánské Lázně water treatment plant |
2001-2003 |
|
Refurbishment of wastewater treatment plant in Most |
2001-2003 | |
|
ZAT a.s. |
Dukovany NPP I&C system renewal – selected portions of modules M2 and M1 |
2001-2009 |
|
ZPA-RP, a.s. |
Refurbishment of I&C machine room at Tisová Power Station |
2004 |
| ZPS-Elektromontáže a.s. | Comprehensive supply of 110 kV substation, MORAVSKÉ TEPLÁRNY, a.s., Zlín | 2001 |