References - Service
|
Customer |
Name of the project | Time of implementation |
|
ABB s.r.o. |
Replacement of generator switchgears at Počerady and Prunéřov Power Stations |
2004 |
|
AB Facility a.s. |
Mondi Packing Paper - service and maintanance |
2005-2007 |
|
A & K s. r. o. |
Bosch servis – electrical wiring |
2005 |
| ALTUS Most |
Video system for coal handling, Poříčí II Power Station |
2002 |
|
ČESKÝ TELECOM, |
Electronic security system – supply, installation and service |
2004 |
|
ČEZ, a. s. |
Measuring secondary and tertiary regulation between ORION and IVS, Dukovany NPP |
2002 |
|
Refurbishment of coal handling substation, Mělník Power Station |
2005 | |
|
Service, maintenance, repairs, and operational oversight of continual emissions measurement analytical technology in the emissions monitoring system |
2005-2015 | |
|
Repair of railway freight car unloading system, Mělník Power Station |
2002 | |
| Pressure measurement in absorber, Ledvice Power Station | 2002 | |
| Repair of six transformers, Tušimice Power Station | 2002 | |
| Long-term comprehensive maintenance including overhauls, routine repairs and preventive maintenance on M&R and electrical equipment in ČEZ, a. s. power plants | ongoing | |
|
ECO - BUILDING |
Optimizing of FGD at Ledvice Power Station |
2005 |
|
Emerson Process |
Migration of WDPF system, Mělník II Power Station |
2006 |
|
Energotrans, a.s. |
Rekonstrukce generátorovývh vypínačů, Elektrárna Mělník I |
2007 |
|
GOLDBECK Bau |
Construction of Vibracoustic CZ Mělník warehouse hall – electrical portion |
2004 |
|
Greif - akustika, |
Anti-noise measures on K11, K12 boiler air intakes, Tisová Power Station |
2006 |
|
Harpen ČR, s.r.o. |
Refurbishment of electrical equipment at Náchod Power Heating Plant |
2005 |
|
Jihomoravská energetika, a.s. |
Maintenance and routine repairs on 110 kV substation |
2004 |
|
ŠKO-ENERGO, s.r.o. |
Servicing work on emissions monitoring equipment |
2005-2006 |
|
Lomy Mořina s.r.o. |
Service work on protectors |
2004 |
|
MERO ČR, a.s. |
Inspection of 110 kV substation |
2006 |
|
MICROSYS Brno |
Installation work on fine grinding line, including connection of a control system |
2004 |
|
ORGREZ, a.s. |
Service, maintenance, repairs, and operational oversight of EMON analytical technology |
2005 |
| Povodí Ohře, s.p. | Calibration of water meters | 2004 |
| Pražská teplárenská a.s. | Replacement of protectors on HV motors | 2004 |
|
REGULA, a.s. |
Electrical work on Boiler No. 5 – Lovochemie Lovosice |
2002 |
|
Vězeňská služba ČR |
Servicing work on I&C and electrical systems |
2004 |