Do you agree that we use cookies to help us find out how our website works and what we can improve on it for you, and to ensure that we do not bother you with inappropriate advertising? More information

logo1 logo2 Datový zdroj 2

  • Contacts

EN
  • CZ
  • EN
  • RU

  • Home
  • About us
  • Products
  • News
  • References
  • Download
EN
  • CZ
  • EN
  • RU

Do you agree that we use cookies to help us find out how our website works and what we can improve on it for you, and to ensure that we do not bother you with inappropriate advertising? More information

logo2 Datový zdroj 2

  • Home
  • About us
  • Products
  • News
  • References
  • Download

  • Contacts

Dukovany NPP - Replacement of Graviner Mark V oil mist detector

28/01/20
Dukovany NPP - Replacement of Graviner Mark V oil mist detector

In January this year, after winning the public tender, a contract was concluded with ČEZ a.s. for “Replacement of Graviner Mark V oil mist detector” (measurement of oil vapour concentration on DG), when the current equipment manufacturer stopped producing the current type of equipment and no longer provided spare parts. As a replacement, new equipment, which is in the active part of its life cycle, will be installed in the twelve existing positions. Based on the requirements of the client, the system of Daihatsu Diesel - type MD-SX II was suggested.

The implementation includes complete delivery and implementation, including the performance of appropriate technical inspections, tests and commissioning.

The work will be implemented in twelve sub-units gradually in all production units. The completion is planned for 2024.


  • Home
  • About us
  • Products
  • News
  • References
  • Download

  • Contacts

I&C Energo a.s.
Pražská 684/49
674 01 Třebíč
Czech Republic

P +420 568 413 111
F +420 568 413 999
E obchod@ic-energo.eu

Please, send your tax documents
in electronic form only
to uctarna@ic-energo.eu.

Contacts
General Terms and Conditions
Certification

Mapa


  • facebook
  • youtube
  • Site map
  • Cookie Settings
  • Webdesign PILOT
  • aPilot Platform
  • Site map
  • Cookie Settings
  • Webdesign PILOT
  • aPilot Platform
  • © 2025I&C Energo a.s.