I&C Energo a.s. and ČEZ, a.s. concluded a long-term contract for work on Logical Unit I&C at the Dukovany and Temelín nuclear power plants. The contract is valid until 2028. The core focus is the preparation, monitoring and implementation of repairs of I&C equipment, including the provision of technical support to customers. more
I&C Energo a.s. is the long-term supplier of maintenance services for the logical unit “ELECTRICAL”, which represents the equipment of power plant on-site consumption (working, reserve and emergency power supply), including power output. It contains voltage levels VHV (400 and 110kV), HV (24 and 6kV) and LV. more
From 2015 until 2023, I&C Energo a.s. participates in the program “Modernization and Safety Improvement of Ukrainian Nuclear Power Plants”. more
The purpose of the project, implemented for ČEZ, a.s., is to properly ensure the supply of essential service water (ESW) to the air conditioning (AC) units and other loads on HVB1 and HVB2 of the Temelín NPP and guarantee the removal of heat from selected loads, prevention of degradation of the used material and corrosion contamination. more
The purpose of the project implemented for ČEZ, a.s. is the installation of a return pipeline with electrical valves controlled from MCR (main control room) and ECR (emergency control room) from each gas storage tank to enable the return of the content of these gas storage tanks to the air-tight zone. more
The contract for ŠKODA PRAHA a.s. is being implemented from 2021 to 2027. The scope of supply is the preparation of the documentation part, the delivery of rectifiers and inverters, the subsequent implementation at the Dukovany NPP. more
In 2015, a contract for the replacement of boric acid (H3BO3) analyzers on Mochovce NPP Units 1 and 2 was concluded with Slovenské elektrárny, a.s. The existing analyzers – boron meters – were obsolete, with no possibility of getting spare parts. more
Production of a regenerative unit for the incinerator of waste vapours of volatile organic compounds
In 2021, I&C Energo successfully completed a major engineering contract in the field of air protection for HK ENGINEERING s.r.o. Specifically, this was the production of a regenerative unit for a VOC waste vapour incinerator. more
The implementation consisted in the delivery of the PowerOPTI optimization and monitoring system from I&C Energo a.s. and its configuration for the Tušimice power plant, in order to monitor and control the efficiency of the power plant in near real time. more
In connection with the fulfilment of the obligations undertaken by the Czech Republic in 2015, the transformation process of Czech power engineering is taking place, the main goal of which is to eliminate CO2 emissions, which occur during burning of coal in coal-fired power plants. more
In 2024, the company I&C Energo successfully implemented and completed the project „ Reconstruction of HV switchgear for Prague „ in the premises of the Mělník Power Plant. The switchgear powers the motors of the circulation pumps for the thermal supply of heat to Prague. more
I&C Energo has manufactured and delivered blower units for the nuclear power plants in Temelín, Dukovany, Kozloduy (Bulgaria), and Paks (Hungary). These units are supplied with technical documentation, and we ensure the participation of technicians during installation and commissioning. more
The subject of the project is the modernization of the existing fixed firefighting system (FFS) using CO2 gas and includes the complete replacement of the FFS motor rooms with CO2 systems and the associated pipe distribution network. more
In 2023, I&C Energo successfully implemented and completed the project „Replacement of the UHV Switchgear” at the premises of the Lafarge Cement plant in Čížkovice. more
The subject of this public contract is the preparation of project documentation and the subsequent implementation of the project. The scope of the contract involves the replacement of rectifiers and inverters for the secured power supply of the safety systems of the I. and III/I. categories in the 1st and 2nd main production units of the Temelín Nuclear Power Plant. more
In 2024, I&C Energo successfully implemented and completed the modernization of the starting transformer AUE 23 at the Mělník Power Plant. more
The subject of the contract is to ensure the long-term operability of the I&C equipment for selected non-unit facilities in the Dukovany NPP, the establishment of an industrial communication network connecting individual operating assemblies, and the creation of a central control room for non-unit facilities. more
Replacement of supply, discharge, drainage and venting pipes, including piping components – fixtures on the essential service water (TVD) system from carbon design to stainless steel design, type 17 348. more
The complex replacement of sectional DC switchboards in the Dukovany Nuclear Power Plant. These switchboards distribute electricity between the rectifier, the battery and DC consumers, protects outlets against overload, cycling and capacity testing of the battery. more
The Cabling Management System (Systém správy kabeláže – SSK) is a specialized software tool to support the design,
implementation and operation of cabling systems for large technological systems, developed and used by our Company
for over 10 years. more
I&C Energo a.s. realized a contract entitled “Reconstruction of the high-voltage substation 6kV E105” on the premises of Mondi Štětí, Energy Division. This substation powers the technology of the K10 boiler. more
The scope of the work for the “Completion of the electrification of technology for the production of foam glass insulation” for LAHTI PRECISION OY (Finland) included the supply, delivery, transport, complete installation and testing of electrical equipment, cable lines and cables, including all structures, materials, equipment, components and services. more
The scope of this work included the design and implementation of an optimum technical and economic solution for the complete coverage of in-house consumption of electricity in the power plant from the R01 ENO A substation, using the capacity of units 1, 2 of ENO B. more
In 2014 and 2015, two implementation stages of the modernization of the hydraulic regulation of the turbine generator (TG) and the bypass steam dump to condenser (PSK) took place on Temelín NPP Units 1 and 2. more