Do you agree that we use cookies to help us find out how our website works and what we can improve on it for you, and to ensure that we do not bother you with inappropriate advertising? More information

logo1 logo2 Datový zdroj 2

  • Contacts

EN
  • CZ
  • EN
  • RU

  • Home
  • About us
  • Products
  • News
  • References
  • Download
EN
  • CZ
  • EN
  • RU

Do you agree that we use cookies to help us find out how our website works and what we can improve on it for you, and to ensure that we do not bother you with inappropriate advertising? More information

logo2 Datový zdroj 2

  • Home
  • About us
  • Products
  • News
  • References
  • Download

  • Contacts

References

Dukovany Nuclear Power Plant – Renewal of I&C for non-unit equipment

Dukovany Nuclear Power Plant – Renewal of I&C for non-unit equipment

The subject of the contract is to ensure the long-term operability of the I&C equipment for selected non-unit facilities in the Dukovany NPP, the establishment of an industrial communication network connecting individual operating assemblies, and the creation of a central control room for non-unit facilities. more

Temelín Nuclear Power Plant B850-1 (2) VF-Gradual replacement of pipes for essential service water in the primary circuit

Temelín Nuclear Power Plant B850-1 (2) VF-Gradual replacement of pipes for essential service water in the primary circuit

Replacement of supply, discharge, drainage and venting pipes, including piping components – fixtures on the essential service water (TVD) system from carbon design to stainless steel design, type 17 348. more

Dukovany Nuclear Power Plant – Reconstruction of sectional DC switchboards

Dukovany Nuclear Power Plant – Reconstruction of sectional DC switchboards

The complex replacement of sectional DC switchboards in the Dukovany Nuclear Power Plant. These switchboards distribute electricity between the rectifier, the battery and DC consumers, protects outlets against overload, cycling and capacity testing of the battery. more

Dukovany Nuclear Power Plant – I&C maintenance

Dukovany Nuclear Power Plant – I&C maintenance

The core focus of the contract is the preparation, monitoring and implementation of repairs of I&C equipment, including the provision of technical support to customers. Maintenance activities also include the provision of the required materials and spare parts within the framework of the comprehensive safety, integrity and reliability of the serviced equipment. more

Use of SSK in I&C Energo projects

Use of SSK in I&C Energo projects

The Cabling Management System (Systém správy kabeláže – SSK) is a specialized software tool to support the design,
implementation and operation of cabling systems for large technological systems, developed and used by our Company
for over 10 years. more

Mondi Štětí – Reconstruction of the high-voltage substation 6kV E105

Mondi Štětí – Reconstruction of the high-voltage substation 6kV E105

 “Reconstruction of the highvoltage substation 6kV E105” on the premises of Mondi Štětí, Energy Division. This substation powers the technology of the K10 boiler. This contract involved dismantling the existing VH151 switchboard, with twenty-three arrays, and replacing it with a new UNIGEAR ZS1 switchboard produced by ABB, with eighteen arrays, including the preparation of design documentation. more

Klášterec nad Ohří – Completion of the electrification of technology for the production of foam glass insulation

Klášterec nad Ohří – Completion of the electrification of technology for the production of foam glass insulation

The scope of the work for the “Completion of the electrification of technology for the production of foam glass insulation” for LAHTI PRECISION OY (Finland) included the supply, delivery, transport, complete installation and testing of electrical equipment, cable lines and cables, including all structures, materials, equipment, components and services. more

Slovak Republic – Reconstruction of 110kV substation – ENO 2nd stage

Slovak Republic – Reconstruction of 110kV substation – ENO 2nd stage

The scope of this work included the design and implementation of an optimum technical and economic solution for the complete coverage of in-house consumption of electricity in the power plant from the R01 ENO A substation, using the capacity of units 1, 2 of ENO B. more


  • Home
  • About us
  • Products
  • News
  • References
  • Download

  • Contacts

I&C Energo a.s.
Pražská 684/49
674 01 Třebíč
Czech Republic

P +420 568 413 111
F +420 568 413 999
E obchod@ic-energo.eu

Please, send your tax documents
in electronic form only
to uctarna@ic-energo.eu.

Contacts
General Terms and Conditions
Certification

Mapa


  • facebook
  • youtube
  • Site map
  • Cookie Settings
  • Webdesign PILOT
  • aPilot Platform
  • Site map
  • Cookie Settings
  • Webdesign PILOT
  • aPilot Platform
  • © 2025I&C Energo a.s.