Do you agree that we use cookies to help us find out how our website works and what we can improve on it for you, and to ensure that we do not bother you with inappropriate advertising? More information

logo1 logo2 Datový zdroj 2

  • Contacts

EN
  • CZ
  • EN
  • RU

  • Home
  • About us
  • Products
  • News
  • References
  • Download
EN
  • CZ
  • EN
  • RU

Do you agree that we use cookies to help us find out how our website works and what we can improve on it for you, and to ensure that we do not bother you with inappropriate advertising? More information

logo2 Datový zdroj 2

  • Home
  • About us
  • Products
  • News
  • References
  • Download

  • Contacts

Implementation of measures for automatic detection and solution of protection against OPC (Open Phase Condition)

01/03/22
Implementation of measures for automatic detection and solution of protection against OPC (Open Phase Condition)

I&C Energo has concluded a contract for the implementation of a tender entitled "Implementation of measures for automatic detection and solution of protection against OPC”.

The subject of the work is the addition of new automation and terminals, parameterization, modification of the existing equipment and interconnection with the existing protection system to perform the required function of detection and protection against OPC at the Temelín NPP. The implementation will take place during outages from 2023 to 2025.


  • Home
  • About us
  • Products
  • News
  • References
  • Download

  • Contacts

I&C Energo a.s.
Pražská 684/49
674 01 Třebíč
Czech Republic

P +420 568 413 111
F +420 568 413 999
E obchod@ic-energo.eu

Please, send your tax documents
in electronic form only
to uctarna@ic-energo.eu.

Contacts
General Terms and Conditions
Certification

Mapa


  • facebook
  • youtube
  • Site map
  • Cookie Settings
  • Webdesign PILOT
  • aPilot Platform
  • Site map
  • Cookie Settings
  • Webdesign PILOT
  • aPilot Platform
  • © 2022I&C Energo a.s.