Do you agree that we use cookies to help us find out how our website works and what we can improve on it for you, and to ensure that we do not bother you with inappropriate advertising? More information

logo1 logo2 Datový zdroj 2

  • Contacts

EN
  • CZ
  • EN
  • RU

  • Home
  • About us
  • Products
  • News
  • References
  • Download
EN
  • CZ
  • EN
  • RU

Do you agree that we use cookies to help us find out how our website works and what we can improve on it for you, and to ensure that we do not bother you with inappropriate advertising? More information

logo2 Datový zdroj 2

  • Home
  • About us
  • Products
  • News
  • References
  • Download

  • Contacts

Modifications of the ventilation routes of the space under the heads of the steam generator secondary collectors at the Temelín NPP

01/02/21
Modifications of the ventilation routes of the space under the heads of the steam generator secondary collectors at the Temelín NPP
Modifications of the ventilation routes of the space under the heads of the steam generator secondary collectors at the Temelín NPP
Modifications of the ventilation routes of the space under the heads of the steam generator secondary collectors at the Temelín NPP
Modifications of the ventilation routes of the space under the heads of the steam generator secondary collectors at the Temelín NPP

The implementation of the change will eliminate screw joints and heterogeneous welded joints and return to the original design state. Part of the implementation is processing of the project and implementation documentation, delivery of the necessary material, reconstruction of the ventilation piping routes and repair of any defective nozzles on the secondary heads. The implementation also includes the preparation of a test sample (standard), on which the volume defectoscopy method Phased Array will be tested to detect volume defects in fillet welds between the nozzle and the secondary head of the steam generator or in the body of the nozzle itself.

The supplied equipment is included in safety class 2 according to the Decree on Requirements for Design of Nuclear Installation (329/2017 Coll.).


  • Home
  • About us
  • Products
  • News
  • References
  • Download

  • Contacts

I&C Energo a.s.
Pražská 684/49
674 01 Třebíč
Czech Republic

P +420 568 413 111
F +420 568 413 999
E obchod@ic-energo.eu

Please, send your tax documents
in electronic form only
to uctarna@ic-energo.eu.

Contacts
General Terms and Conditions
Certification

Mapa


  • facebook
  • youtube
  • Site map
  • Cookie Settings
  • Webdesign PILOT
  • aPilot Platform
  • Site map
  • Cookie Settings
  • Webdesign PILOT
  • aPilot Platform
  • © 2025I&C Energo a.s.