Do you agree that we use cookies to help us find out how our website works and what we can improve on it for you, and to ensure that we do not bother you with inappropriate advertising? More information

logo1 logo2 Datový zdroj 2

  • Contacts

EN
  • CZ
  • EN
  • RU

  • Home
  • About us
  • Products
  • News
  • References
  • Download
EN
  • CZ
  • EN
  • RU

Do you agree that we use cookies to help us find out how our website works and what we can improve on it for you, and to ensure that we do not bother you with inappropriate advertising? More information

logo2 Datový zdroj 2

  • Home
  • About us
  • Products
  • News
  • References
  • Download

  • Contacts

Partial modification to the KHP system (fuel cladding tightness control system) at the Dukovany NPP

12/11/19
Partial modification to the KHP system (fuel cladding tightness control system) at the Dukovany NPP

In 2019 - 2020, the contract “7168 - Partial modification to the KHP system” will be implemented at the Dukovany NPP. The objective of the work is to supplement the supply of pure condensate and low-pressure air for the purpose of flushing the KHP system.

The current system will be supplied with the necessary media for flushing and drying the circuit, or they will be separated by valves from the backbone system, which will enable periodic maintenance on the KHP system.

The implementation will take place in five sub-units, with completion planned for the end of 2020.


  • Home
  • About us
  • Products
  • News
  • References
  • Download

  • Contacts

I&C Energo a.s.
Pražská 684/49
674 01 Třebíč
Czech Republic

P +420 568 413 111
F +420 568 413 999
E obchod@ic-energo.eu

Please, send your tax documents
in electronic form only
to uctarna@ic-energo.eu.

Contacts
General Terms and Conditions
Certification

Mapa


  • facebook
  • youtube
  • Site map
  • Cookie Settings
  • Webdesign PILOT
  • aPilot Platform
  • Site map
  • Cookie Settings
  • Webdesign PILOT
  • aPilot Platform
  • © 2025I&C Energo a.s.