Do you agree that we use cookies to help us find out how our website works and what we can improve on it for you, and to ensure that we do not bother you with inappropriate advertising? More information

logo1 logo2 Datový zdroj 2

  • Contacts

EN
  • CZ
  • EN
  • RU

  • Home
  • About us
  • Products
  • News
  • References
  • Download
EN
  • CZ
  • EN
  • RU

Do you agree that we use cookies to help us find out how our website works and what we can improve on it for you, and to ensure that we do not bother you with inappropriate advertising? More information

logo2 Datový zdroj 2

  • Home
  • About us
  • Products
  • News
  • References
  • Download

  • Contacts

The Dukovany NPP – Extension of the electrical unit control system to allow implementation of connections from related systems, including implementation of new information and cyber requirements

15/05/24
Illustration photo

Having won the tender, I&C Energo a.s. in cooperation with the companies TES s.r.o. and ZAT a.s. will implement the contract "Extension of the electrical unit control system for the possibility of implementing connections from related systems, including implementation of new information and cyber safety requirements" at the Dukovany NPP in the following years.

Within the project, the electrical unit control system will be supplemented with a new cabinet equipped with a new PLC (programmable logic controller) and other elements. It will enable us to create new communication links between systems and implement new information and cyber safety requirements. A direct data connection between the electrical unit control system and the electrical unit monitoring system will be established and communication will be direct.

The new PLC allows communication on IEC 61850 protocol, is fully backward compatible and will communicate with the existing PLCs of the electrical unit control system over ZAT proprietary bus (Pernet). The cabinet will also allow for installation and connection of a new synchronization device and will also provide a reserve for future needs to add links to the electrical unit control system. At the same time, the inadequate method of data transfer between the electrical unit control system and the electrical unit monitoring system will be resolved, and signals that are currently missing will be transferred to the electrical unit control system via the new direct communication link between the electrical unit monitoring system and the electrical unit control system.

The project will be implemented in 20 sub-units. Completion is planned for the year 2032.


  • Home
  • About us
  • Products
  • News
  • References
  • Download

  • Contacts

I&C Energo a.s.
Pražská 684/49
674 01 Třebíč
Czech Republic

P +420 568 413 111
F +420 568 413 999
E obchod@ic-energo.eu

Please, send your tax documents
in electronic form only
to uctarna@ic-energo.eu.

Contacts
General Terms and Conditions
Certification

Mapa


  • facebook
  • youtube
  • Site map
  • Cookie Settings
  • Webdesign PILOT
  • aPilot Platform
  • Site map
  • Cookie Settings
  • Webdesign PILOT
  • aPilot Platform
  • © 2025I&C Energo a.s.