Tušimice power plant - Creation and installation of equipment to reduce solid pollutants (TZL) according to best available technology
10/11/21
Our company I&C Energo plays a significant role in the replacement of particulate filters for the four units of the Tušimice power plant with its important business partner, Metrostav a.s. Division 3. We are responsible for electrical and I&C parts.
On the first unit, B 21 - trial operation and related Guarantee measurements are in progress. The planned provisional acceptance (PAC) as of 18 November 2021 is not hindered at this time.