Do you agree that we use cookies to help us find out how our website works and what we can improve on it for you, and to ensure that we do not bother you with inappropriate advertising? More information

logo1 logo2 Datový zdroj 2

  • Contacts

EN
  • CZ
  • EN
  • RU

  • Home
  • About us
  • Products
  • News
  • References
  • Download
EN
  • CZ
  • EN
  • RU

Do you agree that we use cookies to help us find out how our website works and what we can improve on it for you, and to ensure that we do not bother you with inappropriate advertising? More information

logo2 Datový zdroj 2

  • Home
  • About us
  • Products
  • News
  • References
  • Download

  • Contacts

News

Continuous service of the control system in Synthesii

Continuous service of the control system in Synthesii

03/08/22

In July, our company signed an important contract, on the basis of which we will carry out long-term after-warranty service of the control system of the new K13 CFB (circulating fluidized bed) boiler at Synthesia a.s. more

Heating and Power Industry Days 2022

Heating and Power Industry Days 2022

11/05/22

On 27 - 28 April 2022, we participated in the Heating and Power Industry Days 2022, this time in the role of conference partner. more

Humanitarian aid to the Ukraine

Humanitarian aid to the Ukraine

22/04/22

This week, I&C Energo a.s. has sent a significant shipment of humanitarian aid to the war-torn Ukraine. more

Moai statue at the Temelín NPP

Moai statue at the Temelín NPP

14/04/22

 Representatives of I&C Energo a.s. unveiled a scaled-down replica of the Moai statue. more

NUCLEAR ENCOUNTER 2022 Conference

NUCLEAR ENCOUNTER 2022 Conference

13/04/22

I&C Energo was the main partner and participant in the Nuclear Encounter 2022 international conference. more

The Dukovany NPP - Reconstruction of computer network in selected facilities

The Dukovany NPP - Reconstruction of computer network in selected facilities

16/03/22

I&C Energo has succeeded in the tender "Reconstruction of computer network in selected facilities" at the Dukovany NPP. The work will consist in the processing of the project documentation and the subsequent implementation of the reconstruction of the metallic cabling of the computer network in selected facilities. more

Replacement of cables at the end of qualified life in 2025

Replacement of cables at the end of qualified life in 2025

I&C Energo has succeeded in the negotiated procedure with public disclosure and concluded a contract with ČEZ, a.s. for a tender "Replacement of cables at the end of qualified life in 2025" at the Dukovany Nuclear Power Plant. more

Replacement of the HV substation in the Čížkovice Cement Plant

Replacement of the HV substation in the Čížkovice Cement Plant

09/03/22

I&C Energo a.s. has concluded a contract with Lafarge Cement a.s. for the implementation of the work Replacement of the HV substation in the premises of the Čížkovice Cement Plant. more

Implementation of measures for automatic detection and solution of protection against OPC (Open Phase Condition)

Implementation of measures for automatic detection and solution of protection against OPC (Open Phase Condition)

01/03/22

I&C Energo has concluded a contract for the implementation of a tender entitled "Implementation of measures for automatic detection and solution of protection against OPC”. more

Production and installation of steam superheater

Production and installation of steam superheater

15/02/22

The company I&C Energo won an interesting contract for the production of a steam superheater for the company INTERPHARMA PRAHA, a.s. more

Replacement of rectifiers and inverters at the Temelín NPP

Replacement of rectifiers and inverters at the Temelín NPP

08/02/22

I&C Energo won a contract for the project "Replacement of rectifiers and inverters at both main production units at the Temelín NPP" more

Signing of a memorandum of cooperation with Westinghouse Electric Company

Signing of a memorandum of cooperation with Westinghouse Electric Company

19/01/22

On 13 January 2022, I&C Energo a.s. and Westinghouse Electric Company signed a memorandum of cooperation. more

Replacement of shut-off valves of main feeding heads at the Dukovany NPP

Replacement of shut-off valves of main feeding heads at the Dukovany NPP

06/01/22

I&C Energo has won a public tender and will be implementing a contract entitled "Replacement of shut-off valves of main feeding heads" at the Dukovany Nuclear Power Plant. more

I&C Energo has established a subsidiary in Hungary

I&C Energo has established a subsidiary in Hungary

13/12/21

Since December 2021, I&C Energo Magyarország Kft., a 100% subsidiary of I&C Energo a.s., has been registered in the Hungarian Commercial Register more

Signing of a memorandum of cooperation with EDF

Signing of a memorandum of cooperation with EDF

06/12/21

Dne 1. 12. 2021 podepsali zástupci společnosti EDF a I&C Energo memorandum o spolupráci pro 5 blok JE Dukovany. more

Contract for the implementation of active water disposal systems in the secondary side of the steam generator at the Temelín NPP

Contract for the implementation of active water disposal systems in the secondary side of the steam generator at the Temelín NPP

06/12/21

I&C Energo won a public contract for the implementation of the "disposal of active water in the secondary side of the steam generator" at the Temelín NPP more

I&C Energo a.s. and WESTINGHOUSE are to modernize the Temelín Instrumentation & Control systems

I&C Energo a.s. and WESTINGHOUSE are to modernize the Temelín Instrumentation & Control systems

30/11/21

On 29 November 2021, I&C Energo and Westinghouse signed a nine-year contract for the modernization of instrumentation & control systems at the Temelín Nuclear Power Plant. more

Tušimice power plant - Creation and installation of equipment to reduce solid pollutants (TZL) according to best available technology

Tušimice power plant - Creation and installation of equipment to reduce solid pollutants (TZL) according to best available technology

10/11/21

Company I&C Energo plays a significant role in the replacement of particulate filters for the four units of the Tušimice power plant. more

"New Nuclear Resources" Conference

"New Nuclear Resources" Conference

01/10/21

I&C Energo was a partner of the conference NUCLEUS - New Nuclear Resources more

Replacement of essential service water (ESW) pipelines for cooling air-conditioning units and other appliances at the main production unit at the Temelín NPP

Replacement of essential service water (ESW) pipelines for cooling air-conditioning units and other appliances at the main production unit at the Temelín NPP

30/08/21

I&C Energo has won a public contract for the project "1(2)VF - Replacement of ESW pipelines for cooling air-conditioning units and other appliances at the main production unit". more

Camera system in a refinery in Kralupy nad Vltavou

Camera system in a refinery in Kralupy nad Vltavou

30/08/21

I&C Energo is completing the revitalization of the camera system at the ORLEN Unipetrol refinery in Kralupy nad Vltavou. This is the installation of a new camera system with more than 60 cameras. more

Replacement of protective equipment at the Temelín NPP

Replacement of protective equipment at the Temelín NPP

13/08/21

Within the obtained public contract, the electrical protective equipment of power output and station power supply will be replaced, while ensuring the same range of protected equipment, through new digital protective equipment at the Temelín NPP.  more

Replacement of stable fire extinguishing equipment pipes on transformers and additional protection of conservators at the Temelín NPP

Replacement of stable fire extinguishing equipment pipes on transformers and additional protection of conservators at the Temelín NPP

13/08/21

I&C Energo has won a public contract, the subject of which is the processing of documentation and subsequent implementation of the work consisting in the replacement of stable fire extinguishing equipment pipes with new pipes on transformers 1(2)AT1(2,3), 1(2)BT1(2 ) and 7(8)BT1(2) including increasing the protection of conservators by adding pipes and spray nozzles with k-factor k20. more

Implementation of a camera system

Implementation of a camera system

11/08/21

There will be a new camera system at the SK Dynamo České Budějovice football stadium implemented by I&C Energo a.s. more

I&C Energo and KEPCO E&C sign MoU to cooperate on Dukovany 5 New Nuclear Power Plant Construction Project

I&C Energo and KEPCO E&C sign MoU to cooperate on Dukovany 5 New Nuclear Power Plant Construction Project

06/08/21

I&C Energo signed a Memorandum of Understanding(MoU) with KEPCO E&C on 4th August to cooperate on Dukovany 5 new nuclear power plant construction project. more

Bryzgalnaya project, Ukraine

Bryzgalnaya project, Ukraine

11/05/21

Despite the unfavourable epidemiological situation, we continued working on the installation of equipment supplied by our company to Energoatom, the largest nuclear unit operator in Central Europe. more

Replacement of rectifiers and inverters at the Dukovany NPP

Replacement of rectifiers and inverters at the Dukovany NPP

10/05/21

I&C Energo a.s., in cooperation with ŠKODA PRAHA a.s., will implement a significant part of the contract 7641 - Replacement of SZN1(2,3,5) rectifiers and inverters at the Dukovany NPP within the scope of documentation, supplies and own implementation. more

Reconstruction of isolation valve panels on cryogenic vessels

Reconstruction of isolation valve panels on cryogenic vessels

07/05/21

In the course of 2021, I&C Energo a.s. will implement the project “Reconstruction of isolation valve panels on cryogenic vessels for storage of technical liquid gases” at the Dukovany NPP. more

Security of important rooms outside the guarded area of the Dukovany NPP

Security of important rooms outside the guarded area of the Dukovany NPP

06/05/21

In 2021 and 2022, I&C Energo a.s will implement the contract – Security of important rooms outside the guarded area of the Dukovany NPP. more

I&C Energo relies on its own engineering

I&C Energo relies on its own engineering

05/05/21

Interview with the CEO of I&C Energo a.s. Jiří Holinka in the magazine Industry reports No. 2/2021. more

page
  • previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • next

  • Home
  • About us
  • Products
  • News
  • References
  • Download

  • Contacts

I&C Energo a.s.
Pražská 684/49
674 01 Třebíč
Czech Republic

P +420 568 413 111
F +420 568 413 999
E obchod@ic-energo.eu

Please, send your tax documents
in electronic form only
to uctarna@ic-energo.eu.

Contacts
General Terms and Conditions
Certification

Mapa


  • facebook
  • youtube
  • Site map
  • Cookie Settings
  • Webdesign PILOT
  • aPilot Platform
  • Site map
  • Cookie Settings
  • Webdesign PILOT
  • aPilot Platform
  • © 2025I&C Energo a.s.