Do you agree that we use cookies to help us find out how our website works and what we can improve on it for you, and to ensure that we do not bother you with inappropriate advertising? More information

logo1 logo2

  • Contacts

EN
  • CZ
  • EN
  • RU

  • Home
  • About us
  • Products
  • News
  • References
  • Download
EN
  • CZ
  • EN
  • RU

Do you agree that we use cookies to help us find out how our website works and what we can improve on it for you, and to ensure that we do not bother you with inappropriate advertising? More information

logo2 Datový zdroj 2

  • Home
  • About us
  • Products
  • News
  • References
  • Download

  • Contacts

News

Success in the selection procedure

Success in the selection procedure

24/07/20

On the basis of the officially announced results, I&C Energo won the tenders announced by ČEZ for the conclusion of Framework Agreements for the maintenance, repair and inspection of equipment of Electrical and I&C systems logical units at the Dukovany and Temelín nuclear power plants for the period from 2021 to 2028. more

NPP Dukovany - Replacement of electric drives

NPP Dukovany - Replacement of electric drives

20/04/20

Having won a competitive tender, I&C Energo will implement the contract "7253 Replacement of 1-4RY11-16S02 electric drives" at the Dukovany NPP. more

Delivery of blowers for the Kozloduy NPP

Delivery of blowers for the Kozloduy NPP

20/04/20

I&C Energo, through SIMEX, has delivered eight ICE85AE blower aggregates to the Kozloduy Nuclear Power Plant in Bulgaria. more

Bryzgalnaya Project

Bryzgalnaya Project

20/04/20

Having loaded the last parts of a 35 kV switchboard last December, we started planning the assembly work together with our customer, the state-owned company Energoatom and its subsidiary Atomkomplekt. At that moment, none of us could not imagine what challenges we, or in fact the whole world, would face. more

I&C Energo a.s. and KHNP corporate meeting

I&C Energo a.s. and KHNP corporate meeting

24/02/20

On Wednesday, 12 February 2020, representatives of KHNP (the Korean Hydro & Nuclear Power) visited I&C Energo a.s. headquarters in Třebíč. more

SMR 2020 Conference

SMR 2020 Conference

20/02/20

Representatives of I&C Energo a.s. participated in the 6th annual  SMR 2020 Conference, Small Nuclear Reactors - From Concepts to Real SMR Projects, held on 13 February in Prague with the participation of 180 experts. more

Reconstruction of the 400kV substation at the Dukovany NPP

Reconstruction of the 400kV substation at the Dukovany NPP

06/02/20

At the end of 2019, we were successful in the selection procedure for the investment project: 7170 - Reconstruction of the 400kV substation in the Dukovany Nuclear Power Plant in a consortium of the companies  I&C Energo a.s. (Head of Consortium), EGEM s.r.o. and Union Grid s.r.o. more

I&C Energo a.s. - one of the cornerstones of the maintenance of the Czech nuclear power plants

I&C Energo a.s. - one of the cornerstones of the maintenance of the Czech nuclear power plants

29/01/20

At the end of 2019, I&C Energo concluded implementation contracts with ČEZ, a.s. for the maintenance, repairs and inspections of logical units and I&C at the Dukovany and Temelín nuclear power plants for 2020. more

Steam generator safety valves with optimized flow space shape at the Dukovany NPP

Steam generator safety valves with optimized flow space shape at the Dukovany NPP

28/01/20

Contract for sub-delivery within the project "Steam generator safety valves with optimized flow space shape" in the Dukovany NPP. more

Dukovany NPP - Replacement of Graviner Mark V oil mist detector

Dukovany NPP - Replacement of Graviner Mark V oil mist detector

28/01/20

Winning the tender for the “Replacement of Graviner Mark V oil mist detector” (measurement of oil vapour concentration on diesel generator). more

VVER 2019 Conference

VVER 2019 Conference

03/12/19

On 11-12 November, I&C Energo presented itself at the 7th VVER 2019 conference in Prague. more

Successful FAT tests of flow boron meters

Successful FAT tests of flow boron meters

12/11/19

In October 2019, FAT tests (Factory Acceptance Tests) of BorAn PN160 flow boron meters manufactured by I&C Energo for Units 3 and 4 of the Ringhals Nuclear Power Plant were successfully completed. more

Partial modification to the KHP system (fuel cladding tightness control system) at the Dukovany NPP

Partial modification to the KHP system (fuel cladding tightness control system) at the Dukovany NPP

12/11/19

In 2019 - 2020, the contract “7168 - Partial modification to the KHP system” will be implemented at the Dukovany NPP. The objective of the work is to supplement the supply of pure condensate and low-pressure air for the purpose of flushing the KHP system. more

The Dukovany NPP - cooperation with ROEZ, s.r.o.

The Dukovany NPP - cooperation with ROEZ, s.r.o.

12/11/19

Our company takes a significant part in the implementation of the project “7635 - Reconstruction of RČA (air-operated valve - AOV) VELAN“, carried out at the Dukovany NPP by ROEZ, s.r.o., namely its electrical and mechanical parts. more

Reserve air-conditioning units for cooling substations at the Dukovany NPP

Reserve air-conditioning units for cooling substations at the Dukovany NPP

12/11/19

As a result of winning the tender, I&C Energo a.s. will implement the contract “7306 - Reserve air-conditioning units for cooling substations in the 1-4A23 extension“. more

Memorandum of understanding and cooperation in the nuclear field

Memorandum of understanding and cooperation in the nuclear field

30/10/19

In mid-October I&C Energo a.s. and the China Nuclear Power Engineering Company signed a memorandum of understanding and cooperation in the nuclear field. more

Technical assistance at the Chvaletice power plant

Technical assistance at the Chvaletice power plant

15/10/19

Within the project “Optimization of combustion of boilers at units B3 and B4” I&C Energo a.s. and Sev.en Engineering s.r.o. have concluded a contract for technical assistance. more

Modifications to non-unit facilities in the Ledvice power plant

Modifications to non-unit facilities in the Ledvice power plant

15/10/19

After the outage of the Ledvice power plant production unit, I&C Energo a.s. implemented several orders related to modifications of non-unit facilities. more

I&C Energo a.s. at TECHDAYS 2019

I&C Energo a.s. at TECHDAYS 2019

14/10/19

The 4th year of TECHDAYS, held by the District Economic Commission in Litoměřice, took place at the Zahrada Čech  exhibition grounds in Litoměřice. The motto of the event was: “We are not indifferent to the future of our children”. more

Equipment for service load distribution boards in the South Ukraine Nuclear Power Plant

Equipment for service load distribution boards in the South Ukraine Nuclear Power Plant

07/10/19

By loading the sanitary container, we started delivering equipment for the service load distribution boards in the South Ukraine Nuclear Power Plant. more

Upgrading hydrogen unit panel at the Temelín NPP

Upgrading hydrogen unit panel at the Temelín NPP

07/10/19

In the planned outage of the Temelín NPP Unit 2, we carried out a complete upgrade of 2HP08 hydrogen unit panel within the project “E077 – improvement of 1(2)HP08 gas panel” more

Replacement of gland expansion joints on hot water piping from the Mělník Power Plant to the Třeboratice Heating Plant

Replacement of gland expansion joints on hot water piping from the Mělník Power Plant to the Třeboratice Heating Plant

07/08/19

I&C Energo has signed a contract for the replacement of five outgoing DN1200 double-sided gland expansion joints on the hot water pipeline manifold, on its seventh and eighth sections near the municipalities of Chlumín - Obříství and Kojetice. more

Modifications to Unit 6 equipment at the Ledvice Power Plant

Modifications to Unit 6 equipment at the Ledvice Power Plant

06/08/19

During the current outage, I&C Energo a.s. is implementing several orders related to modifications to Unit 6 equipment at the Ledvice Power Plant. more

Renovation of LV distribution boards of the chemical water treatment in the premises of Mondi Štětí a.s.

Renovation of LV distribution boards of the chemical water treatment in the premises of Mondi Štětí a.s.

06/08/19

I&C Energo a.s. and Mondi Štětí, a.s. have entered into a contract to realize the project "Renovation of LV distribution boards of chemical water treatment" in the premises of Mondi Štětí a.s. more

Reconstruction of a distribution board in the premises of Mondi Štětí a.s.

Reconstruction of a distribution board in the premises of Mondi Štětí a.s.

05/08/19

These days our company and Mondi Štětí, a.s. have entered into a contract to realize the project "Reconstruction of the distribution board in 3NZ HV substation" in the premises of Mondi Štětí a.s. more

Dukovany NPP – the use of the cooling surface area of the tower

Dukovany NPP – the use of the cooling surface area of the tower

19/07/19

I&C Energo and ČEZ, a.s. have entered into a contract for a tender “The use of the cooling surface area of the tower designed for the ESW to cool the CCW”. more

ÚJV Řež - illustration image

Repair of the cable routes on the premises of ÚJV Řež, a.s. (Nuclear Research Institute)

09/05/19

At the beginning of 2019, our company and ÚJV Řež, a.s. concluded a contract for the implementation of the project “Repair of cable routes”. more

MONDI Štětí - illustration image

ECOFLEX - COSTIFICATION - stage I + II lighting

09/05/19

At the beginning of 2019, our company and Průmstav Štětí, a.s. concluded a contract for the implementation of the project “ECOFLEX - CAUSTIFICATION - stages I + II lighting” on the premises of Mondi Štětí a.s. more

ÚJV Řež - illustration image

Modification of LDS Ts 423 at the Nuclear Physics Institute (NPI) Řež - New source for structure 231 (NPI)

09/05/19

At the end of  the last year, our company and the NPI Řež, a.s. entered into a contract to realize the project "Modification of LDS Ts 423 - New source for the NPI structure 231" on the premises of the Research Institute of the NPI Řež a.s. more

Reconstruction of distribution boards in C202 KAMYR HV substation

Reconstruction of distribution boards in C202 KAMYR HV substation

09/05/19

Last year, our company and Mondi Štětí, a.s. entered into a contract to realize the project "Reconstruction of distribution boards in C202 KAMYR HV substation" on the premises of Mondi Štětí a.s. more

page
  • previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • next

  • Home
  • About us
  • Products
  • News
  • References
  • Download

  • Contacts

I&C Energo a.s.
Pražská 684/49
674 01 Třebíč
Czech Republic

P +420 568 413 111
F +420 568 413 999
E obchod@ic-energo.eu

Please, send your tax documents
in electronic form only
to uctarna@ic-energo.eu.

Contacts
General Terms and Conditions
Certification

Mapa


  • facebook
  • youtube
  • Site map
  • Cookie Settings
  • Webdesign PILOT
  • aPilot Platform
  • Site map
  • Cookie Settings
  • Webdesign PILOT
  • aPilot Platform
  • © 2023I&C Energo a.s.